TALK TO COMWEB
Describe the workpiece, production conditions and current issue. The equipment model can be confirmed after engineering review.
Industrial projects may begin with the workpiece, images, existing process and observed failure mode. Education projects may begin with the classroom purpose and teaching workflow. Tolerance, cycle time, seat count or the final model do not need to be fixed before the initial review.
START HERE
Submit the requirements that are currently defined
Begin with the contact details, project area and current issue. Remaining engineering inputs are optional at this stage. COMWEB will provide an initial response within three days and identify the additional data required.
- 01The equipment model, tolerance or cycle time may remain open at initial contact
- 02Transfer confidential drawings only after an agreed secure method is established
- 03Any paid evaluation or design work begins only after the scope and fee are explained and approved
Recommended inputs for preliminary technical review
- 01
Workpiece images, material, dimensions and thickness
- 02
Current process and the point at which the issue occurs
- 03
Drawing, tolerance, hole diameter or finished-profile requirements
- 04
Output per shift, required cycle time and automation level
- 05
Production site, delivery schedule and unacceptable conditions
If the project involves unpublished products or drawings, state the confidentiality requirement first so an appropriate transfer method can be arranged.
COMWEB
+886 4 2359 3363comweb73@ms4.hinet.netNo. 16, Gongyequ 20th Road, Nantun District, Taichung City, Taiwan
Monday–Friday, 08:30–17:30 (Taiwan Time)
Submit requirements by email →